5 Steps to Manage Freight Costs in 2027

Published

on

If your procurement strategy still revolves around a single annual tender, you’re not managing freight costs — you’re managing the gap between what you locked in and what the market is actually doing.

I’ve had this conversation with enterprise procurement teams more times than I can count. The annual RFP rhythm made sense for a long time. But as I said in a recent webinar: “The 12-month cycles that tenders are currently having can actually not deal with the changes in the market.”

Today, BAF surcharges can swing 15–25% within a single quarter. Geopolitical events reshape trade lanes overnight. And yet most procurement teams are still trying to manage this volatility with a process designed for a much calmer era.

The Problem With Treating Procurement as an Annual Event

What I see most often is this: organizations react to market trends rather than getting ahead of them. They see what’s happening, go out and do their tender, keep their existing strategies — and then deal with the consequences. Higher prices. More workload. Teams chasing carriers across spreadsheets and disconnected systems.

The real issue isn’t that annual tenders are wrong. It’s that on their own, they’re too slow for a market that moves faster than the contract cycle. When the market shifts, most teams have three options: ignore it, react informally through ad-hoc renegotiations, or build a repeatable way to realign rates with reality. The third is what agile procurement is designed to solve.

What Agile Procurement Actually Means in Practice

When I talk about agile procurement, I’m not talking about doing more tenders. It all comes down to three things: standardize and automate your workflows, benchmark against what’s actually happening in the market, and adjust — not just fuel prices and carrier rates, but your broader strategy. Being on top of the market instead of reacting to it.

In practice, the teams getting this right have stopped treating procurement as something they “do in Q1” and started treating it as an ongoing discipline that runs year-round.

Here are the 5 steps I recommend to get started:

Step 1: Get Your Data in Order

Everything else in agile procurement depends on this. As I often say to customers: procurement data — all our data — that’s the heart of everything. Without good data, you cannot do anything. You cannot act accordingly.

If your rate data is scattered across spreadsheets, carrier emails, and disconnected systems, you can’t move quickly — and neither can your carriers. Developing a standardized, customizable rate card format ensures every carrier submits comparable information. Centralizing this in a cloud-based platform gives all stakeholders real-time access to a single source of truth.

Step 2: Automate Everything That Doesn’t Require Human Judgment

Manual freight procurement is costing your team time it doesn’t have. RfQ generation, carrier invitation, rate card validation, sanity checks, best-rate calculations — none of these require human judgment. They require consistency, speed, and accuracy.

With Freightos Procure, you define your RfQ templates once, and for the next RfQ, you can just launch it within minutes. The carrier invitations, the reminders, the sense checks on whether the data is correct — all that workload that is done manually, often across Teams chats and master Excel spreadsheets — all of that is taken away.

That’s also where the nature of the work changes. Instead of spending days copying and reconciling numbers, procurement professionals spend more time on the things only they can do: balancing cost with service and risk, explaining trade-offs to internal stakeholders, and building more strategic carrier relationships.

Step 3: Know What the Market Is Actually Paying

One of the most common gaps I see in enterprise freight procurement is the absence of reliable, independent benchmarking data. Most teams know roughly where their rates sit — but not precisely how they compare to what the market is actually paying across their specific lanes.

What I see a lot is enterprise shippers simply comparing their existing pre-qualified carriers against each other. They’re launching their RfQ with their carrier database and just looking at the rates. But what’s really important is that you’re looking also at the market — especially when you see how it’s changing. If you’re not looking at the market, you might miss that there is an increase coming, and then you align with a carrier on one-year rates — and the market changes, the fuel prices change, and you end up paying on top even if something different was agreed.

Freightos Terminal gives procurement teams daily-updated spot and contract benchmarks across ocean and air, sourced from over $50 billion in real commercial freight spend. But what I find particularly powerful is the forecasting capability — we give a forecast for up to six months, predicting how the market is actually changing. That’s helping you to tailor your strategy to how the market will be reacting before you see it, so you can prepare accordingly and save money.

Step 4: Run Regular Mini-Bids and Track What’s Working

Annual contracts alone can’t keep pace with market volatility. The teams seeing the biggest procurement gains have moved to a model where they run structured mini-bids on volatile lanes throughout the year — not just at annual tender time.

The logic is straightforward. Because we’re so fast with running RfQs and launching tenders, you can actually check what’s going on, how the market is moving, and decide not to tender your entire pack of lanes. You can look at where the market is going, what your forecasting is saying. Is it going down? Makes sense to tender in that region. Are prices going up? It might make more sense to extend your rates with your existing carriers.

With Freightos Procure, you look at it, you see a recommendation from the tool, you go in, you tender, and within six minutes or less, your mini-bid is on the market and your carriers can work with it.

One question I get often is whether to commit to fixed rates for a full year or stay more flexible. My view: I would always recommend to stay flexible. With a one-year contract in place, you always have to renegotiate if anything happens. I would rather go into something more transactional that you can handle disruptions with more easily.

I also think about it like a portfolio. You should not invest only in one stock. It’s really good to spread the volumes — have some spot, have some mini-bids, have some RfQs. Make sure your network is still running.

Step 5: Don’t Let Fuel and BAF Become a Passive Cost

This is the area where I see most enterprise procurement teams leaving the most money on the table.

Fuel is one of the biggest cost drivers — not just lately, but in general. And the reality is that even if you have an annual contract, during the year the fuel prices can change dramatically. In January you can have a fuel price that is X, and five months later it can go up significantly. It’s really important that all of that is in your rate and that you can always track it back — because then you can also justify it internally.

That’s why at Freightos we developed a feature that can automatically trigger workflows and update fuel prices with your carriers. You can decide if you want to be the one steering that process, or if you actually ask your carriers to update the fuel. The setup is straightforward — for example, if the index is growing by 5%, trigger the update and adjust the fuel price by 3.5%. You set it up once and then it runs automatically in the background. You just need to see what was changed, approve it, and you can bring in indices from wherever you want — for example, the jet fuel index for air freight.

Combined with Freightos Terminal’s real-time market intelligence and the Freightos Baltic Index (FBX), procurement teams can keep fuel costs anchored to actual market conditions year-round — without the overhead of a full renegotiation every time the market moves.

What Changes When You Get This Right

When I talk to teams that have made this shift, a few things consistently come up.

Finance conversations become easier. Instead of defending why your January forecast missed a market shift in August, you can show how your rates track benchmarks over time — and where you chose to lock in versus stay flexible.

Carrier relationships improve. A procurement team that brings data, clarity, and a predictable cadence to negotiations is more attractive than one that disappears for a year and then demands a major rate cut with 10 days’ notice.

Procurement becomes more credible internally. When your sourcing rhythm matches the market’s rhythm, it’s much easier to defend both your costs and your strategy to finance and operations leadership.

A Simple Way to Start

You don’t need a multi-year transformation to begin. Start by auditing where your team’s time actually goes — how much of it is spent on manual rate card validation, carrier chasing, and BAF reconciliation? That’s your baseline.

Pick one area and run it properly for one quarter. If it delivers better outcomes with less manual overhead, you have a proof point. The goal isn’t to do more procurement events. It’s to stop making one big, brittle annual bet and start managing freight costs as if market volatility is the norm — because it is.

Download our 5-step playbook to see exactly how leading enterprise procurement teams are making the shift.

The post 5 Steps to Manage Freight Costs in 2027 appeared first on Freightos.

Continue Reading

Non classé

Walmart’s $6 Billion Automation Bet and DHL’s Orchestration Strategy: Two Playbooks, One Hard Question

Published

on

By

Two announcements in the past three weeks sum up where warehouse automation stands at the end of 2026. On October 29, Walmart and Symbotic expanded their commercial agreement to bring more automation to 25 U.S. regional distribution centers, with an initial commitment of roughly $6 billion spread over several years. Eleven days later, DHL Supply Chain described a very different path: it is scaling the robots it already runs, moving AI orchestration into live warehouses, and piloting what it calls adaptive robotics.

Both are spending heavily, but betting on different ideas about what makes automation pay. For most operators, who are neither Walmart nor DHL, the difference between those ideas matters more than the size of either announcement.

Playbook One: One Vendor, One System, Network Scale

Walmart’s approach is consolidation. Symbotic now supplies a full system rather than a single product: high-density case storage, BreakPack for picking individual items, and SymMicro for store-based e-commerce fulfillment, all run by Symbotic’s own software. Walmart says the expansion will support e-commerce inventory upstream, add storage capacity and make replenishment more reliable.

When one company owns the storage structure, the robots and the control software, there are fewer handoffs between systems from different vendors, and fewer places for goods to pile up when one system cannot see what another is doing. The track record also lends weight. Symbotic reported fiscal third-quarter revenue of $721 million, up 22% year over year, with 56 systems operating and 77 in deployment. Symbotic reported in August that deployment of BreakPack had begun at half of Walmart’s regional distribution centers.

Still, this is a commitment, not a result, and key pieces are still being proven. The first next-generation SymMicro unit was expected to take about six months to install at a Walmart store, and a possible order for 400 back-of-store systems depends on validating that second version. Symbotic itself has said its next revenue and margin inflection is expected in the second half of fiscal 2027.

Playbook Two: Many Robots, One Brain

DHL Supply Chain is betting on coordination rather than consolidation. The company says it has deployed more than 9,000 robots, completed more than 1.5 billion robotic picks and unloaded more than 10 million cases using Boston Dynamics’ Stretch robot. More than 95% of its global warehouses already use advanced digital tools.

The next step is orchestration. After a proof of concept, DHL is putting AI orchestration into live operations as a digital control layer that links data, workers and automated equipment. One workflow it is testing connects mobile robots, packaging automation and the warehouse management system so that resources shift with real-time order demand.

That approach suits a contract logistics provider. DHL serves many customers in many buildings, often on shorter contracts than a retailer would accept for a fixed system. Flexibility is the business model. DHL frames the goal as adding to its workforce, not replacing it. These investments support DHL Group’s broader Strategy 2030 ambition of increasing revenue by 50%.

The Reality Check Most Headlines Skip

Adoption across the market is still thin. Link Logistics, citing Kardex data, reports that about 63% of North American warehouse operations remain fully manual and only about 6% are highly automated, a share that has barely changed since 2024. Integration commonly takes 12 to 18 months and can run past two years for larger systems.

GXO offers another useful reality check. The company is expanding its partnership with Agility Robotics, with Digit humanoids scheduled for deployment at two additional U.S. facilities in 2027. Yet in August, CEO Patrick Kelleher acknowledged that humanoids had not achieved satisfactory returns on investment and that scaled production remained some years away. GXO expects approximately 20,000 robots across its network by year-end, illustrating the considerable distance between conventional robotics adoption and humanoid commercialization.

Scale is still the deciding factor. Walmart can justify a dedicated, end-to-end system because its volume is so large. DHL can justify an orchestration layer because it spreads that investment across more than 9,000 robots and a global network of warehouses.

What Operators Should Ask Before Choosing a Path

For mid-sized shippers, distributors and 3PLs, the lesson is not to copy either company but to be clear about the problem being solved. Four questions help:

Is volume stable enough to justify fixed automation? Dense, integrated systems reward predictable, high-volume flow. Volatile demand favors mobile robots that can be redeployed.

Who owns the control software? Mixing equipment from different suppliers without a single coordinating layer can create bottlenecks at every handoff. Decide who directs the work before buying the hardware.

What happens after go-live? Ask suppliers for evidence on uptime, maintenance cost, recovery from faults and throughput in month 18, not just at commissioning.

Where do people fit? Both Walmart and DHL describe automation as simplifying work for employees rather than removing them. Training, exception handling and clear decision rules for when a robot hands off to a person belong in the business case.

The Bottom Line

Walmart’s $6 billion commitment shows what a single, tightly integrated system can look like at network scale. DHL’s update shows how orchestration can turn a large, mixed robot fleet into one operation. For everyone else, the more useful question is which approach matches their own volume, contracts and tolerance for risk.

The post Walmart’s $6 Billion Automation Bet and DHL’s Orchestration Strategy: Two Playbooks, One Hard Question appeared first on Logistics Viewpoints.

Continue Reading

Non classé

Walmart’s $6 Billion Automation Bet and DHL’s Orchestration Strategy: Two Playbooks, One Hard Question

Published

on

By

Walmart’s $6 Billion Automation Bet And Dhl’s Orchestration Strategy: Two Playbooks, One Hard Question

Two announcements in the past three weeks sum up where warehouse automation stands at the end of 2026. On October 29, Walmart and Symbotic expanded their commercial agreement to bring more automation to 25 U.S. regional distribution centers, with an initial commitment of roughly $6 billion spread over several years. Eleven days later, DHL Supply Chain described a very different path: it is scaling the robots it already runs, moving AI orchestration into live warehouses, and piloting what it calls adaptive robotics.

Both are spending heavily, but betting on different ideas about what makes automation pay. For most operators, who are neither Walmart nor DHL, the difference between those ideas matters more than the size of either announcement.

Playbook One: One Vendor, One System, Network Scale

Walmart’s approach is consolidation. Symbotic now supplies a full system rather than a single product: high-density case storage, BreakPack for picking individual items, and SymMicro for store-based e-commerce fulfillment, all run by Symbotic’s own software. Walmart says the expansion will support e-commerce inventory upstream, add storage capacity and make replenishment more reliable.

When one company owns the storage structure, the robots and the control software, there are fewer handoffs between systems from different vendors, and fewer places for goods to pile up when one system cannot see what another is doing. The track record also lends weight. Symbotic reported fiscal third-quarter revenue of $721 million, up 22% year over year, with 56 systems operating and 77 in deployment. Symbotic reported in August that deployment of BreakPack had begun at half of Walmart’s regional distribution centers.

Still, this is a commitment, not a result, and key pieces are still being proven. The first next-generation SymMicro unit was expected to take about six months to install at a Walmart store, and a possible order for 400 back-of-store systems depends on validating that second version. Symbotic itself has said its next revenue and margin inflection is expected in the second half of fiscal 2027.

Playbook Two: Many Robots, One Brain

DHL Supply Chain is betting on coordination rather than consolidation. The company says it has deployed more than 9,000 robots, completed more than 1.5 billion robotic picks and unloaded more than 10 million cases using Boston Dynamics’ Stretch robot. More than 95% of its global warehouses already use advanced digital tools.

The next step is orchestration. After a proof of concept, DHL is putting AI orchestration into live operations as a digital control layer that links data, workers and automated equipment. One workflow it is testing connects mobile robots, packaging automation and the warehouse management system so that resources shift with real-time order demand.

That approach suits a contract logistics provider. DHL serves many customers in many buildings, often on shorter contracts than a retailer would accept for a fixed system. Flexibility is the business model. DHL frames the goal as adding to its workforce, not replacing it. These investments support DHL Group’s broader Strategy 2030 ambition of increasing revenue by 50%.

The Reality Check Most Headlines Skip

Adoption across the market is still thin. Link Logistics, citing Kardex data, reports that about 63% of North American warehouse operations remain fully manual and only about 6% are highly automated, a share that has barely changed since 2024. Integration commonly takes 12 to 18 months and can run past two years for larger systems.

GXO offers another useful reality check. The company is expanding its partnership with Agility Robotics, with Digit humanoids scheduled for deployment at two additional U.S. facilities in 2027. Yet in August, CEO Patrick Kelleher acknowledged that humanoids had not achieved satisfactory returns on investment and that scaled production remained some years away. GXO expects approximately 20,000 robots across its network by year-end, illustrating the considerable distance between conventional robotics adoption and humanoid commercialization.

Scale is still the deciding factor. Walmart can justify a dedicated, end-to-end system because its volume is so large. DHL can justify an orchestration layer because it spreads that investment across more than 9,000 robots and a global network of warehouses.

What Operators Should Ask Before Choosing a Path

For mid-sized shippers, distributors and 3PLs, the lesson is not to copy either company but to be clear about the problem being solved. Four questions help:

Is volume stable enough to justify fixed automation? Dense, integrated systems reward predictable, high-volume flow. Volatile demand favors mobile robots that can be redeployed.

Who owns the control software? Mixing equipment from different suppliers without a single coordinating layer can create bottlenecks at every handoff. Decide who directs the work before buying the hardware.

What happens after go-live? Ask suppliers for evidence on uptime, maintenance cost, recovery from faults and throughput in month 18, not just at commissioning.

Where do people fit? Both Walmart and DHL describe automation as simplifying work for employees rather than removing them. Training, exception handling and clear decision rules for when a robot hands off to a person belong in the business case.

The Bottom Line

Walmart’s $6 billion commitment shows what a single, tightly integrated system can look like at network scale. DHL’s update shows how orchestration can turn a large, mixed robot fleet into one operation. For everyone else, the more useful question is which approach matches their own volume, contracts and tolerance for risk.

The post Walmart’s $6 Billion Automation Bet and DHL’s Orchestration Strategy: Two Playbooks, One Hard Question appeared first on Logistics Viewpoints.

Continue Reading

Non classé

The Next Logistics Capacity Investment May Not Be Another Building

Published

on

By

When a distribution center begins to run out of capacity, the conversation usually turns to physical expansion. The company may need another building, a larger yard, additional dock doors, more equipment, or a second site closer to customers. Those are familiar decisions, supported by familiar metrics: square footage, pallet positions, average volume, and the cost of carrying another lease.

There is a question that should come before the capital request. Is the network actually short of physical capacity, or is too much of the capacity it already owns being lost between activities? A dock door waiting for a late trailer is technically available but not productive. A switcher that cannot identify the next trailer to move is on the payroll but not adding throughput. A shipment that cannot be scheduled may tie up inventory even while the warehouse has labor ready to load it.

The answer matters because building capacity and recovering capacity are different investments. One expands the physical system; the other improves how the existing system is used. In the right circumstances, the second can deliver faster returns with less capital at risk. It will not eliminate every expansion, but it can prevent companies from mistaking operational friction for a structural shortage.

Red Gold illustrates the capacity hidden in scheduling

Food manufacturer Red Gold offers a concrete example. Its distribution operations once depended on large volumes of phone calls and email exchanges to coordinate dock appointments. In peak periods, some carriers could face a wait of two weeks to book a slot. That scheduling delay did not mean the operation had no physical space in an absolute sense; it meant access to available capacity was poorly coordinated.

In a case study published by Opendock and Loadsmart, Red Gold reported moving more than 60,000 annual appointments into online carrier self-scheduling. Appointment lead times fell 90%, from double-digit days to roughly one or two days, and case throughput increased 18%. The customer also introduced transportation management and brokerage changes, including ShipperGuide. It would therefore be too simplistic to credit every improvement to a single scheduling product.

The operational logic is nevertheless compelling. Advance notice allows a facility to stage orders, allocate docks and labor, and reduce the uncertainty created by a constant stream of last-minute phone calls. Employees who previously entered appointments can devote more attention to exceptions. Carriers gain a clearer path to an available slot instead of repeatedly contacting the shipper to discover one.

None of that creates new square footage. It improves the utilization of the square footage already present, which is exactly why scheduling belongs in a capital planning conversation rather than being classified as an administrative convenience.

Rated capacity is not realized capacity

Capacity planning often treats the warehouse as a set of tangible resources: doors, lift trucks, people, storage positions, conveyor rates, or pick locations. But the actual output of those resources depends on synchronization. A dock cannot be productive merely because it exists; freight, equipment, documentation, labor, and a usable appointment window must arrive together.

Consider a simplified facility with 30 dock doors operating across sixteen scheduled hours, with each transaction averaging two hours of door time. Its theoretical, uninterrupted maximum is 240 trailer transactions per day. At 70% productive occupancy, that falls to 168. Increasing productive occupancy to 80% yields 192 transactions—a gain of approximately 14% relative to realized throughput. These figures are an illustration, not a real facility result, and they assume receiving, storage, and shipping operations can absorb the extra volume.

That caveat is crucial. No facility should be operated at 100% utilization at all times. Maintenance, arrival variability, worker safety, late orders, and disruption recovery require buffer capacity. The objective is not to eliminate slack indiscriminately. It is to distinguish deliberate resilience from avoidable idle time, and then determine what the extra capacity would actually be worth.

The same argument applies across a multi-site network. One overloaded facility and one underutilized facility do not necessarily offset each other, because the freight may be in the wrong place, on the wrong timetable, or attached to the wrong customer commitments. The right unit of analysis is the flow of orders through the network, not simply aggregate square footage.

What dock coordination can recover

GoBolt offers an example closer to the receiving operation. In a 2025 Opendock customer case study, the fulfillment provider reported a 20% improvement in inbound receiving efficiency after replacing fragmented appointment coordination with a more consistent scheduling process. The company also reported recovering 10 to 15 hours of administrative work each week. Those are provider-published operational results, not an audited calculation of avoided building investment, but they show how better arrival predictability can help a receiving team extract more work from its existing doors and shifts.

The distinction between receiving efficiency and physical expansion is important. If more freight can be accepted and processed in the same labor window, management may have room to defer a capital project or meet a seasonal peak without adding a shift. That conclusion requires evidence: gate-to-door time, unload duration, dock-to-stock performance, staffing, and the utilization of downstream storage and putaway resources. A faster appointment system alone cannot prove that the entire facility has gained equivalent usable capacity.

Ralph Moyle, a food-and-beverage warehousing and transportation provider, presents a second dimension of the problem. Its operation coordinated as many as 500 weekly appointments across 37 dock doors. According to an Opendock case study published in November 2025, the organization reduced labor devoted to dock scheduling by more than 30% and gained clearer information on carrier punctuality and detention windows. This is a scheduling-labor result, not a published 30% improvement in warehouse throughput. It nonetheless illustrates a recurring investment choice: deploy scarce people against routine coordination, or free them to handle the exceptions and operating constraints that determine service.

Together, Red Gold, GoBolt, and Ralph Moyle suggest a capital-planning sequence rather than a universal savings percentage. First, measure whether appointment variability and inefficient handoffs are preventing existing assets from delivering their designed throughput. Next, test a bounded change to scheduling and execution, measuring both operational output and service reliability under actual peak conditions. Only then compare recovery investments against a larger building, additional doors, or other capacity additions. Supplier case studies establish plausible mechanisms; the company’s own operational and financial baseline must establish the return.

Treat avoided capital as an option, not a guaranteed saving

There is a temptation to translate every percentage point of productivity improvement into a claim that a new warehouse can be avoided. That overstates the evidence. A throughput gain at one dock or yard may merely move congestion downstream to picking, storage, staging, or outbound transportation. It may also be insufficient to cover peak demand, seasonal swings, or a required redundancy plan.

A rigorous alternative-to-expansion study should therefore define the specific capacity shortage and test the whole process. Start with actual hourly and daily flow data, not averages alone. Identify the constraining resource under peak conditions. Determine the amount of lost capacity attributable to preventable waiting or information errors, estimate the cost to recover it, and confirm that other resources can absorb the improvement. Compare that option with expansion through a common net-present-value analysis, including implementation risk, service impact, and flexibility.

For the CFO, the value of operational improvement is often optionality. A relatively modest investment in scheduling, yard coordination, or workflow redesign may postpone a lease commitment, provide better evidence about the true need for new space, or help size a future facility more accurately. Deferral is not the same as permanently avoiding an investment, and the distinction should appear in the financial model.

For operations leaders, this changes the questions asked of technology vendors. Instead of buying ‘visibility’ or ‘AI’ as abstract capabilities, they can ask what utilization constraint will be removed, what operating metric should change, who must act on the information, and how quickly a measurable result should appear.

The next warehouse may eventually be necessary. Demand growth, service commitments, and network resilience will continue to require physical expansion. But before pouring concrete, companies should understand how much of their current investment is stranded in queues, mismatched schedules, and preventable handoffs. More capacity sometimes starts with another building. Sometimes it starts with getting tomorrow’s truck into the right dock today.

The post The Next Logistics Capacity Investment May Not Be Another Building appeared first on Logistics Viewpoints.

Continue Reading

Trending