Automated Storage and Retrieval Systems (AS/RS) have become a cornerstone of modern warehouse automation strategies. Whether the technology involves shuttles, cube-based systems, cranes, or goods-to-person solutions, the business case is typically built around a common set of objectives: increasing throughput, reducing labor requirements, improving accuracy, and maximizing storage utilization. Yet one of the most important decisions in any AS/RS implementation often receives far less attention than the technology itself: SKU selection.

Companies frequently spend months evaluating vendors, software platforms, and automation architectures. However, even the most advanced AS/RS can fail to deliver expected returns if the wrong products are placed into the system. In many cases, the difference between a highly successful deployment and a disappointing investment comes down to a simple question: Which SKUs should be automated?

The Purpose of AS/RS Is Productivity, Not Storage

One of the most common misconceptions about AS/RS is that its primary purpose is to store inventory. While increased storage density is certainly a benefit, the real value of automation lies in improving warehouse productivity.

AS/RS creates value by reducing manual labor associated with inventory handling. Every automated retrieval eliminates walking, searching, traveling, and material movement. The more frequently a product is handled, the greater the opportunity for automation to generate measurable savings.

This is where SKU velocity becomes critical.

Not all inventory contributes equally to warehouse activity. In most distribution centers, a relatively small percentage of SKUs generates a disproportionately large percentage of order lines, picks, and replenishment activity. These high-velocity items create the majority of warehouse work and therefore present the greatest opportunity for automation.

Why High-Velocity SKUs Belong in AS/RS

The strongest AS/RS business cases are generally built around automating the products that move most frequently.

Consider two products:

SKU A is picked 2,000 times per week.

SKU B is picked 10 times per month.

Both consume storage space within the AS/RS, but only one generates meaningful operational value.

Every time SKU A is automatically retrieved, labor is eliminated and productivity improves. Over the course of a year, those savings accumulate rapidly. SKU B, on the other hand, occupies valuable automated storage capacity while contributing very little to throughput improvement or labor reduction.

Simply put, high-velocity SKUs produce the transactions that justify the investment.

When organizations prioritize their fastest-moving inventory for AS/RS storage, they maximize:

Labor savings

Pick productivity

Throughput performance

Equipment utilization

Return on investment

This is why leading warehouse operators often use ABC inventory analysis to determine AS/RS eligibility, with A-items receiving priority placement within the automated system.

The Hidden Cost of Selecting the Wrong SKUs

Many automation projects encounter challenges not because the technology underperforms, but because the SKU strategy was flawed from the start.

A common mistake is attempting to place too many slow-moving products into the AS/RS simply because capacity is available. While this may increase storage utilization, it often reduces economic utilization.

An AS/RS filled with low-velocity inventory can create several problems:

Lower Labor Savings

Products that rarely move generate few picking events. As a result, automation replaces little labor activity, weakening the original business case.

Reduced Throughput Benefits

System resources become occupied storing inventory that contributes minimally to order fulfillment activity, limiting the throughput impact of the investment.

Longer Payback Periods

If labor savings and productivity gains fall below projections, the expected payback period can extend significantly beyond the original ROI model.

Capacity Constraints

As demand grows, operators may discover that high-velocity items no longer have sufficient space within the AS/RS because slower-moving products are consuming capacity.

The technology itself may be performing exactly as designed, but the financial return can still disappoint.

Focus on Activity, Not SKU Count

One of the most important lessons for warehouse leaders is that AS/RS success should not be measured by the number of SKUs stored within the system.

Instead, it should be measured by the percentage of warehouse activity flowing through the system.

For example, placing 1,000 high-velocity SKUs into an AS/RS that captures 80% of total picking activity will typically generate greater value than storing 5,000 SKUs that account for only 40% of picks.

The goal is not to automate the greatest amount of inventory.

The goal is to automate the greatest amount of work.

That distinction has significant implications for system utilization and overall project economics.

The Importance of Continuous SKU Evaluation

SKU selection should not be treated as a one-time exercise conducted during system commissioning.

Demand patterns change. Product popularity shifts. New items are introduced while others decline.

As a result, warehouse operators should periodically re-evaluate which products belong inside the AS/RS. High-velocity inventory today may not be high-velocity inventory next year.

Organizations that continuously align automated storage capacity with current demand patterns are often able to sustain higher utilization rates and stronger ROI throughout the life of the system.

ROI strategy

Consider a simple ROI example. Assume a company invests $5 million in an AS/RS and expects to save $1 million annually through labor reduction and productivity improvements. The original business case assumes the system will handle 75 percent of warehouse picking activity.

If the company correctly slots high-velocity products into the system, the projected labor savings can be achieved, resulting in a payback period of approximately five years. However, if management fills a large portion of the AS/RS with slow-moving inventory, the system may only process 40 percent of warehouse picking activity. Annual savings could fall to $600,000, extending the payback period from 5 years to more than 8 years. The technology has not failed. The SKU strategy has.

Final Thoughts

AS/RS technology continues to play an increasingly important role in warehouse automation strategies. Yet successful implementations depend on much more than selecting the right hardware or software platform.

The most effective AS/RS deployments are built around careful SKU selection.

High-velocity products generate the majority of warehouse activity and therefore create the greatest opportunity for labor reduction, throughput improvement, and productivity gains. Conversely, filling automated systems with low-velocity inventory can significantly dilute returns and extend payback periods.

For warehouse and supply chain executives, the takeaway is straightforward: an AS/RS should be designed around activity, not occupancy. The objective is not simply to store products in an automated system. The objective is to automate the work that drives operational performance. In most facilities, that means ensuring the highest-velocity SKUs receive priority access to valuable AS/RS capacity.

The difference between a successful automation investment and an underperforming one may ultimately come down to a decision that appears deceptively simple: choosing the right SKUs.

The post Why SKU Selection Can Make or Break an AS/RS Business Case appeared first on Logistics Viewpoints.

Continue Reading

Non classé

Walmart’s $6 Billion Automation Bet and DHL’s Orchestration Strategy: Two Playbooks, One Hard Question

Published

on

By

Two announcements in the past three weeks sum up where warehouse automation stands at the end of 2026. On October 29, Walmart and Symbotic expanded their commercial agreement to bring more automation to 25 U.S. regional distribution centers, with an initial commitment of roughly $6 billion spread over several years. Eleven days later, DHL Supply Chain described a very different path: it is scaling the robots it already runs, moving AI orchestration into live warehouses, and piloting what it calls adaptive robotics.

Both are spending heavily, but betting on different ideas about what makes automation pay. For most operators, who are neither Walmart nor DHL, the difference between those ideas matters more than the size of either announcement.

Playbook One: One Vendor, One System, Network Scale

Walmart’s approach is consolidation. Symbotic now supplies a full system rather than a single product: high-density case storage, BreakPack for picking individual items, and SymMicro for store-based e-commerce fulfillment, all run by Symbotic’s own software. Walmart says the expansion will support e-commerce inventory upstream, add storage capacity and make replenishment more reliable.

When one company owns the storage structure, the robots and the control software, there are fewer handoffs between systems from different vendors, and fewer places for goods to pile up when one system cannot see what another is doing. The track record also lends weight. Symbotic reported fiscal third-quarter revenue of $721 million, up 22% year over year, with 56 systems operating and 77 in deployment. Symbotic reported in August that deployment of BreakPack had begun at half of Walmart’s regional distribution centers.

Still, this is a commitment, not a result, and key pieces are still being proven. The first next-generation SymMicro unit was expected to take about six months to install at a Walmart store, and a possible order for 400 back-of-store systems depends on validating that second version. Symbotic itself has said its next revenue and margin inflection is expected in the second half of fiscal 2027.

Playbook Two: Many Robots, One Brain

DHL Supply Chain is betting on coordination rather than consolidation. The company says it has deployed more than 9,000 robots, completed more than 1.5 billion robotic picks and unloaded more than 10 million cases using Boston Dynamics’ Stretch robot. More than 95% of its global warehouses already use advanced digital tools.

The next step is orchestration. After a proof of concept, DHL is putting AI orchestration into live operations as a digital control layer that links data, workers and automated equipment. One workflow it is testing connects mobile robots, packaging automation and the warehouse management system so that resources shift with real-time order demand.

That approach suits a contract logistics provider. DHL serves many customers in many buildings, often on shorter contracts than a retailer would accept for a fixed system. Flexibility is the business model. DHL frames the goal as adding to its workforce, not replacing it. These investments support DHL Group’s broader Strategy 2030 ambition of increasing revenue by 50%.

The Reality Check Most Headlines Skip

Adoption across the market is still thin. Link Logistics, citing Kardex data, reports that about 63% of North American warehouse operations remain fully manual and only about 6% are highly automated, a share that has barely changed since 2024. Integration commonly takes 12 to 18 months and can run past two years for larger systems.

GXO offers another useful reality check. The company is expanding its partnership with Agility Robotics, with Digit humanoids scheduled for deployment at two additional U.S. facilities in 2027. Yet in August, CEO Patrick Kelleher acknowledged that humanoids had not achieved satisfactory returns on investment and that scaled production remained some years away. GXO expects approximately 20,000 robots across its network by year-end, illustrating the considerable distance between conventional robotics adoption and humanoid commercialization.

Scale is still the deciding factor. Walmart can justify a dedicated, end-to-end system because its volume is so large. DHL can justify an orchestration layer because it spreads that investment across more than 9,000 robots and a global network of warehouses.

What Operators Should Ask Before Choosing a Path

For mid-sized shippers, distributors and 3PLs, the lesson is not to copy either company but to be clear about the problem being solved. Four questions help:

Is volume stable enough to justify fixed automation? Dense, integrated systems reward predictable, high-volume flow. Volatile demand favors mobile robots that can be redeployed.

Who owns the control software? Mixing equipment from different suppliers without a single coordinating layer can create bottlenecks at every handoff. Decide who directs the work before buying the hardware.

What happens after go-live? Ask suppliers for evidence on uptime, maintenance cost, recovery from faults and throughput in month 18, not just at commissioning.

Where do people fit? Both Walmart and DHL describe automation as simplifying work for employees rather than removing them. Training, exception handling and clear decision rules for when a robot hands off to a person belong in the business case.

The Bottom Line

Walmart’s $6 billion commitment shows what a single, tightly integrated system can look like at network scale. DHL’s update shows how orchestration can turn a large, mixed robot fleet into one operation. For everyone else, the more useful question is which approach matches their own volume, contracts and tolerance for risk.

The post Walmart’s $6 Billion Automation Bet and DHL’s Orchestration Strategy: Two Playbooks, One Hard Question appeared first on Logistics Viewpoints.

Continue Reading

Non classé

Walmart’s $6 Billion Automation Bet and DHL’s Orchestration Strategy: Two Playbooks, One Hard Question

Published

on

By

Walmart’s $6 Billion Automation Bet And Dhl’s Orchestration Strategy: Two Playbooks, One Hard Question

Two announcements in the past three weeks sum up where warehouse automation stands at the end of 2026. On October 29, Walmart and Symbotic expanded their commercial agreement to bring more automation to 25 U.S. regional distribution centers, with an initial commitment of roughly $6 billion spread over several years. Eleven days later, DHL Supply Chain described a very different path: it is scaling the robots it already runs, moving AI orchestration into live warehouses, and piloting what it calls adaptive robotics.

Both are spending heavily, but betting on different ideas about what makes automation pay. For most operators, who are neither Walmart nor DHL, the difference between those ideas matters more than the size of either announcement.

Playbook One: One Vendor, One System, Network Scale

Walmart’s approach is consolidation. Symbotic now supplies a full system rather than a single product: high-density case storage, BreakPack for picking individual items, and SymMicro for store-based e-commerce fulfillment, all run by Symbotic’s own software. Walmart says the expansion will support e-commerce inventory upstream, add storage capacity and make replenishment more reliable.

When one company owns the storage structure, the robots and the control software, there are fewer handoffs between systems from different vendors, and fewer places for goods to pile up when one system cannot see what another is doing. The track record also lends weight. Symbotic reported fiscal third-quarter revenue of $721 million, up 22% year over year, with 56 systems operating and 77 in deployment. Symbotic reported in August that deployment of BreakPack had begun at half of Walmart’s regional distribution centers.

Still, this is a commitment, not a result, and key pieces are still being proven. The first next-generation SymMicro unit was expected to take about six months to install at a Walmart store, and a possible order for 400 back-of-store systems depends on validating that second version. Symbotic itself has said its next revenue and margin inflection is expected in the second half of fiscal 2027.

Playbook Two: Many Robots, One Brain

DHL Supply Chain is betting on coordination rather than consolidation. The company says it has deployed more than 9,000 robots, completed more than 1.5 billion robotic picks and unloaded more than 10 million cases using Boston Dynamics’ Stretch robot. More than 95% of its global warehouses already use advanced digital tools.

The next step is orchestration. After a proof of concept, DHL is putting AI orchestration into live operations as a digital control layer that links data, workers and automated equipment. One workflow it is testing connects mobile robots, packaging automation and the warehouse management system so that resources shift with real-time order demand.

That approach suits a contract logistics provider. DHL serves many customers in many buildings, often on shorter contracts than a retailer would accept for a fixed system. Flexibility is the business model. DHL frames the goal as adding to its workforce, not replacing it. These investments support DHL Group’s broader Strategy 2030 ambition of increasing revenue by 50%.

The Reality Check Most Headlines Skip

Adoption across the market is still thin. Link Logistics, citing Kardex data, reports that about 63% of North American warehouse operations remain fully manual and only about 6% are highly automated, a share that has barely changed since 2024. Integration commonly takes 12 to 18 months and can run past two years for larger systems.

GXO offers another useful reality check. The company is expanding its partnership with Agility Robotics, with Digit humanoids scheduled for deployment at two additional U.S. facilities in 2027. Yet in August, CEO Patrick Kelleher acknowledged that humanoids had not achieved satisfactory returns on investment and that scaled production remained some years away. GXO expects approximately 20,000 robots across its network by year-end, illustrating the considerable distance between conventional robotics adoption and humanoid commercialization.

Scale is still the deciding factor. Walmart can justify a dedicated, end-to-end system because its volume is so large. DHL can justify an orchestration layer because it spreads that investment across more than 9,000 robots and a global network of warehouses.

What Operators Should Ask Before Choosing a Path

For mid-sized shippers, distributors and 3PLs, the lesson is not to copy either company but to be clear about the problem being solved. Four questions help:

Is volume stable enough to justify fixed automation? Dense, integrated systems reward predictable, high-volume flow. Volatile demand favors mobile robots that can be redeployed.

Who owns the control software? Mixing equipment from different suppliers without a single coordinating layer can create bottlenecks at every handoff. Decide who directs the work before buying the hardware.

What happens after go-live? Ask suppliers for evidence on uptime, maintenance cost, recovery from faults and throughput in month 18, not just at commissioning.

Where do people fit? Both Walmart and DHL describe automation as simplifying work for employees rather than removing them. Training, exception handling and clear decision rules for when a robot hands off to a person belong in the business case.

The Bottom Line

Walmart’s $6 billion commitment shows what a single, tightly integrated system can look like at network scale. DHL’s update shows how orchestration can turn a large, mixed robot fleet into one operation. For everyone else, the more useful question is which approach matches their own volume, contracts and tolerance for risk.

The post Walmart’s $6 Billion Automation Bet and DHL’s Orchestration Strategy: Two Playbooks, One Hard Question appeared first on Logistics Viewpoints.

Continue Reading

Non classé

The Next Logistics Capacity Investment May Not Be Another Building

Published

on

By

When a distribution center begins to run out of capacity, the conversation usually turns to physical expansion. The company may need another building, a larger yard, additional dock doors, more equipment, or a second site closer to customers. Those are familiar decisions, supported by familiar metrics: square footage, pallet positions, average volume, and the cost of carrying another lease.

There is a question that should come before the capital request. Is the network actually short of physical capacity, or is too much of the capacity it already owns being lost between activities? A dock door waiting for a late trailer is technically available but not productive. A switcher that cannot identify the next trailer to move is on the payroll but not adding throughput. A shipment that cannot be scheduled may tie up inventory even while the warehouse has labor ready to load it.

The answer matters because building capacity and recovering capacity are different investments. One expands the physical system; the other improves how the existing system is used. In the right circumstances, the second can deliver faster returns with less capital at risk. It will not eliminate every expansion, but it can prevent companies from mistaking operational friction for a structural shortage.

Red Gold illustrates the capacity hidden in scheduling

Food manufacturer Red Gold offers a concrete example. Its distribution operations once depended on large volumes of phone calls and email exchanges to coordinate dock appointments. In peak periods, some carriers could face a wait of two weeks to book a slot. That scheduling delay did not mean the operation had no physical space in an absolute sense; it meant access to available capacity was poorly coordinated.

In a case study published by Opendock and Loadsmart, Red Gold reported moving more than 60,000 annual appointments into online carrier self-scheduling. Appointment lead times fell 90%, from double-digit days to roughly one or two days, and case throughput increased 18%. The customer also introduced transportation management and brokerage changes, including ShipperGuide. It would therefore be too simplistic to credit every improvement to a single scheduling product.

The operational logic is nevertheless compelling. Advance notice allows a facility to stage orders, allocate docks and labor, and reduce the uncertainty created by a constant stream of last-minute phone calls. Employees who previously entered appointments can devote more attention to exceptions. Carriers gain a clearer path to an available slot instead of repeatedly contacting the shipper to discover one.

None of that creates new square footage. It improves the utilization of the square footage already present, which is exactly why scheduling belongs in a capital planning conversation rather than being classified as an administrative convenience.

Rated capacity is not realized capacity

Capacity planning often treats the warehouse as a set of tangible resources: doors, lift trucks, people, storage positions, conveyor rates, or pick locations. But the actual output of those resources depends on synchronization. A dock cannot be productive merely because it exists; freight, equipment, documentation, labor, and a usable appointment window must arrive together.

Consider a simplified facility with 30 dock doors operating across sixteen scheduled hours, with each transaction averaging two hours of door time. Its theoretical, uninterrupted maximum is 240 trailer transactions per day. At 70% productive occupancy, that falls to 168. Increasing productive occupancy to 80% yields 192 transactions—a gain of approximately 14% relative to realized throughput. These figures are an illustration, not a real facility result, and they assume receiving, storage, and shipping operations can absorb the extra volume.

That caveat is crucial. No facility should be operated at 100% utilization at all times. Maintenance, arrival variability, worker safety, late orders, and disruption recovery require buffer capacity. The objective is not to eliminate slack indiscriminately. It is to distinguish deliberate resilience from avoidable idle time, and then determine what the extra capacity would actually be worth.

The same argument applies across a multi-site network. One overloaded facility and one underutilized facility do not necessarily offset each other, because the freight may be in the wrong place, on the wrong timetable, or attached to the wrong customer commitments. The right unit of analysis is the flow of orders through the network, not simply aggregate square footage.

What dock coordination can recover

GoBolt offers an example closer to the receiving operation. In a 2025 Opendock customer case study, the fulfillment provider reported a 20% improvement in inbound receiving efficiency after replacing fragmented appointment coordination with a more consistent scheduling process. The company also reported recovering 10 to 15 hours of administrative work each week. Those are provider-published operational results, not an audited calculation of avoided building investment, but they show how better arrival predictability can help a receiving team extract more work from its existing doors and shifts.

The distinction between receiving efficiency and physical expansion is important. If more freight can be accepted and processed in the same labor window, management may have room to defer a capital project or meet a seasonal peak without adding a shift. That conclusion requires evidence: gate-to-door time, unload duration, dock-to-stock performance, staffing, and the utilization of downstream storage and putaway resources. A faster appointment system alone cannot prove that the entire facility has gained equivalent usable capacity.

Ralph Moyle, a food-and-beverage warehousing and transportation provider, presents a second dimension of the problem. Its operation coordinated as many as 500 weekly appointments across 37 dock doors. According to an Opendock case study published in November 2025, the organization reduced labor devoted to dock scheduling by more than 30% and gained clearer information on carrier punctuality and detention windows. This is a scheduling-labor result, not a published 30% improvement in warehouse throughput. It nonetheless illustrates a recurring investment choice: deploy scarce people against routine coordination, or free them to handle the exceptions and operating constraints that determine service.

Together, Red Gold, GoBolt, and Ralph Moyle suggest a capital-planning sequence rather than a universal savings percentage. First, measure whether appointment variability and inefficient handoffs are preventing existing assets from delivering their designed throughput. Next, test a bounded change to scheduling and execution, measuring both operational output and service reliability under actual peak conditions. Only then compare recovery investments against a larger building, additional doors, or other capacity additions. Supplier case studies establish plausible mechanisms; the company’s own operational and financial baseline must establish the return.

Treat avoided capital as an option, not a guaranteed saving

There is a temptation to translate every percentage point of productivity improvement into a claim that a new warehouse can be avoided. That overstates the evidence. A throughput gain at one dock or yard may merely move congestion downstream to picking, storage, staging, or outbound transportation. It may also be insufficient to cover peak demand, seasonal swings, or a required redundancy plan.

A rigorous alternative-to-expansion study should therefore define the specific capacity shortage and test the whole process. Start with actual hourly and daily flow data, not averages alone. Identify the constraining resource under peak conditions. Determine the amount of lost capacity attributable to preventable waiting or information errors, estimate the cost to recover it, and confirm that other resources can absorb the improvement. Compare that option with expansion through a common net-present-value analysis, including implementation risk, service impact, and flexibility.

For the CFO, the value of operational improvement is often optionality. A relatively modest investment in scheduling, yard coordination, or workflow redesign may postpone a lease commitment, provide better evidence about the true need for new space, or help size a future facility more accurately. Deferral is not the same as permanently avoiding an investment, and the distinction should appear in the financial model.

For operations leaders, this changes the questions asked of technology vendors. Instead of buying ‘visibility’ or ‘AI’ as abstract capabilities, they can ask what utilization constraint will be removed, what operating metric should change, who must act on the information, and how quickly a measurable result should appear.

The next warehouse may eventually be necessary. Demand growth, service commitments, and network resilience will continue to require physical expansion. But before pouring concrete, companies should understand how much of their current investment is stranded in queues, mismatched schedules, and preventable handoffs. More capacity sometimes starts with another building. Sometimes it starts with getting tomorrow’s truck into the right dock today.

The post The Next Logistics Capacity Investment May Not Be Another Building appeared first on Logistics Viewpoints.